- Operation sequence: turn on the water pump first, then turn on the thermostat. When shutting down, turn off the thermostat first, wait for a while (depending on the power of the thermostat, ranging from 10 seconds to 1 minute), and then turn off the water pump.
- Reliable leakage protection equipment must be installed, it must be installed and debugged by a certified electrician, and checked and maintained monthly.
- It's advanced performance and quality is the optimum liquid transport pump on the industrial equipments.
- The effect of auxiliary heating is better. Direct heating requires the use of more powerful machines.
- The matching water pump below 11Kw must have a power of not less than 750W and a flow rate of not less than 13 cubic hours per hour.